Skip to content

End of Week Sale - All Stone Range

Cart

Your cart is empty

CORE VALUES

CORE VALUES
  • Honesty and integrity in all our relationships.

  • Pride and caring in all what we do.

  • Constantly exceeding expectations.

  • Innovation and outstanding teamwork.

  • Reliability, dedication and loyalty.

  • Development and Research.

  • Training and Know‐how transfer.

  • Employing continuous innovation as a main tool to add value to the products.

    Free Instant Quote

    Patio Cost Calculator

    Enter your patio dimensions, choose your material, and get an instant price — exact products, exact quantities, delivered free.

    1
    Your patio size
    metres
    ×
    metres
    2
    Choose material
    3
    Choose product
    Your patio paving cost
    £0
    Delivered free — VAT included
    Paving
    Area (inc 10% for cuts)
    Delivery
    FREE
    VAT
    Included
    + Show full project cost (sub-base, mortar, skip) ▼
    Sundry Materials (estimated)
    MOT Type 1 sub-base150mm compacted
    Sand, cement & primer
    Jointing compound
    £40
    Wacker plate hire
    £40
    Skip hire
    £220
    Total DIY cost
    Professional Installation
    Labour (£65/m² avg)Full installation
    Total with pro install

    Prices from our website, inc VAT + free UK delivery. Sundry costs are estimates.

    Material Calculator

    Sub-Base & Aggregate Calculator

    Work out exactly how much MOT Type 1 sub-base you need for your patio or driveway. Enter your dimensions and depth.

    metres
    metres
    compacted sub-base
    Patio area
    Loose volume neededIncludes 20% compaction allowance
    MOT Type 1 requiredAt ~1.8 tonnes per m³
    Bulk bags~850kg per bulk bag
    MOT Type 1 sub-base is available from your local builders merchant. These are estimates — order 5-10% extra to allow for uneven ground.
    Material Calculator

    Mortar & Laying Course Calculator

    Work out how much sharp sand, cement and jointing compound you need to lay your paving. Enter your dimensions and bed depth.

    metres
    metres
    mortar bed
    Mortar bed volumeFull bed at selected depth
    Sharp sand5:1 mix — bulk bags ~850kg
    Cement25kg bags
    Jointing compound~8m² coverage per tub
    Based on a 5:1 sharp sand to cement bedding mortar. Sand and cement are available from your local builders merchant. Add SBR primer for porcelain. These are estimates — buy 10% extra.
    {